What we do 7 services Solutions for businesses 12 types of space Additional services 2 services
Installation, maintenance and repair · homes, shops, offices and industry View all services →
Roof of a commercial building with the climate control and ventilation units installed

3 years warranty on the equipment

Excellent professionals! […] You can trust them! Mónica Mota · review on Google
Very helpful and genuinely professional. […] I recommend them highly. Miguel Costa · review on Google
The first time we were in contact, they inspired confidence straight away. Samuel Tavares · review on Google
Thank you for a service that was on time, organised and professional. Accountancy and consultancy firm · Seia, translated from Portuguese

Services Construction companies

Air conditioning for construction companies and new builds

We supply and install the climate control on new builds, across mainland Portugal. We come in as a licensed subcontractor, and what we fit leaves tested.

or call: 915 100 172
  • The climate control goes in at the right point of the build.

    First fix is done while the walls are still open: piping, condensate drain and capacity supply. Leave it to the end and you pay to open the walls a second time.

  • It cleans the air.

    The filter in the unit holds the dust a building job leaves behind, and the ventilation brings in fresh air from outside. In a newly finished flat, it is what takes the smell of the works away.

Maintenance on a fixed date.

When the equipment is not a home unit, maintenance cannot wait for someone to remember it. It runs on agreed dates, so it does not stop on the day it is needed most.

And above a certain amount of refrigerant it stops being a choice. The Regulamento (UE) 2024/573 requires the owner of the equipment to have it checked for leaks at least once a year above five tonnes of CO₂ equivalent, and only by a certified person. A home unit is normally below that limit. A commercial system passes it easily.

«During the installation, the entire staff was very careful and attentive. I highly recommend it.”
Miguel Costa · review on Google

We supply and install these brands:

Anyone working on the refrigerant circuit is certified for fluorinated greenhouse gases. The team has manufacturer training from Daikin and LG.

Meet the team →
  • 15 years of completed work.
  • We serve all mainland Portugal.
  • We supply and install.
  • Three-year warranty on the equipment.
  • F-refrigerant certification IMPIC licence Public liability insurance Technician responsible for maintenance

How we work.

  1. Assessment and quote

    We come to the site, take the measurements and tell you the capacity you need. The visit is free and so is the quote, which comes with a fixed price, in writing.

  2. Installation and testing

    Clean work, on the agreed day. At the end we test it in front of you and show you how to use the remote.

  3. Maintenance

    We're just a call away when it's time to review the unit.

Tell us what you need.

Climaartificial intelligence
  1. Service
  2. Space
  3. Area
  4. When
  5. Contact

By sending this, you allow us to use your data to respond to the request. Privacy Assistant by soljoria

This is not a quote: the team confirms everything with you before there is a price.

Questions we are often asked.

We do. We hold an IMPIC licence and work under the main contractor, with the climate control package in our hands. We also take the job from scratch when the owner calls us directly.

Both. We do Spiro and Climaver ducting, VRF and multi-split systems, and the ventilation. In a building with many units it is usually VRF that solves it: one machine outside serving several indoor units.

We do. Piping, drainage and capacity go in while the walls are still open, and the equipment arrives at the end, when there is no longer any risk of damaging it.

We do. We price what is written in it, and we say where it does not add up when that is the case. The quote comes in writing, with a fixed price.

We do, and no two are the same. The contract has dates set in advance, so the unit does not fail on the day you need it most. What goes into it depends on the units you have and the hours they run, and it is agreed in the quote or over the phone. On a new build the contract is set up after handover, with whoever ends up owning the space.