What we do 6 services Solutions for businesses 10 types of space Additional services 2 services
Installation, maintenance and repair · homes, shops, offices and industry View all services →
Empty gym training room, with punching bags suspended and the ceiling structure visible

Air conditioning for gyms

In a training room, the heat and humidity belong to whoever is there. Cooling down is not enough: the air also needs to be renewed.

or call: 915 100 172

We have been installing in mainland Portugal since 2011.

What we deliver.

  • Sized for occupancy

    Thirty people training heat a room much more than thirty people sitting. The capacity comes from there and from the ceiling height, not from the floor area.

  • Fresh air, not just cold air

    In a crowded room the problem is both heat and stale air. Fresh-air ventilation addresses what cooling alone cannot.

  • No draughts over people training

    The air is distributed across the ceiling, to sweep the entire room without blowing directly onto anyone who is sweating.

  • Maintenance at the pace of use

    In a gym, the filters get dirty faster and the equipment works longer hours. Contracted maintenance plans combine at this rate.

How we work.

  1. Tell us about the gym

    Area, ceiling height, what rooms there are and how many people there are at rush hour. No commitment.

  2. Technical visit

    We measure, evaluate what exists and design the right solution.

  3. Fixed quote

    Equipment, deadlines and price in writing. No surprises.

  4. Work and monitoring

    We install, test and stay close by with maintenance.

★★★★★
«The first time there was contact, they immediately showed trust.»
Samuel Tavares · review on Google
5,0 on Google
2011 year of foundation

We sell, install and maintain the main brands.

Questions we are often asked.

Cooling down solves the heat, but it doesn't solve the stale air. In a room with people training it is also necessary to renew the air, and the two things are decided together.

Due to the occupancy at rush hour and the ceiling height, more than the area. A full class releases much more heat than the same room with half a dozen people.

It can, if the distribution is poorly thought out. The location and orientation of the units are chosen so that the air sweeps the room without reaching the people.

Get dirty. There is more dust in suspension and the equipment works longer hours, so maintenance is combined with shorter intervals than in an office.