What we do 7 services Solutions for businesses 12 types of space Additional services 2 services
Installation, maintenance and repair · homes, shops, offices and industry View all services →
Metallic ventilation ducts crossing the ceiling of an industrial building

3 years warranty on the equipment

Excellent professionals! […] You can trust them! Mónica Mota · review on Google
Very helpful and genuinely professional. […] I recommend them highly. Miguel Costa · review on Google
The first time we were in contact, they inspired confidence straight away. Samuel Tavares · review on Google
Thank you for a service that was on time, organised and professional. Accountancy and consultancy firm · Seia, translated from Portuguese

Services Warehouses and industrial spaces

Air conditioning and ventilation for warehouses

We sell and install air conditioning for warehouses and industrial units, across mainland Portugal. High ceilings, loading doors that open, heat that rises.

or call: 915 100 172
  • You can work in there in August.

    From midday onwards all the heat is inside, and inside is where people spend the day. Stock that cannot take heat stops being at risk.

  • It cleans the air.

    The filter holds the dust thrown up by the forklifts and the open loading doors. As it cools, the unit pulls out the moisture that ruins cardboard and packaging.

Maintenance on a fixed date.

When the equipment is not a home unit, maintenance cannot wait for someone to remember it. It runs on agreed dates, so it does not stop on the day it is needed most.

And above a certain amount of refrigerant it stops being a choice. The Regulamento (UE) 2024/573 requires the owner of the equipment to have it checked for leaks at least once a year above five tonnes of CO₂ equivalent, and only by a certified person. A home unit is normally below that limit. A commercial system passes it easily.

«Excellent professionals! Available and very friendly. I recommend. They are trustworthy!”
Mónica Mota · review on Google

We supply and install these brands:

Anyone working on the refrigerant circuit is certified for fluorinated greenhouse gases. The team has manufacturer training from Daikin and LG.

Meet the team →
  • 15 years of completed work.
  • We serve all mainland Portugal.
  • We supply and install.
  • Three-year warranty on the equipment.
  • F-refrigerant certification IMPIC licence Public liability insurance Technician responsible for maintenance

How we work.

  1. Assessment and quote

    We come to the site, take the measurements and tell you the capacity you need. The visit is free and so is the quote, which comes with a fixed price, in writing.

  2. Installation and testing

    Clean work, on the agreed day. At the end we test it in front of you and show you how to use the remote.

  3. Maintenance

    We're just a call away when it's time to review the unit.

Tell us what you need.

Climaartificial intelligence
  1. Service
  2. Space
  3. Area
  4. When
  5. Contact

By sending this, you allow us to use your data to respond to the request. Privacy Assistant by soljoria

This is not a quote: the team confirms everything with you before there is a price.

Questions we are often asked.

No. In a warehouse, volume counts and not area: the ceiling height, the doors that open and the heat that rises and is trapped in the ceiling. The calculation is different, and so is the equipment.

It does, if all the heat stays on the ceiling, heating what no one uses. So the first question in an industrial building is what to do with the hot air that rises, and then how much capacity is needed.

Ventilating and air conditioning solve different problems: one renews the air, the other changes the temperature. At the visit we see which of the two the space needs. Often it is only one.

We do, under contract, and what the contract says depends on the client. Visits are preventive, so the equipment does not stop working when it is needed.

We do, and no two are the same. The contract has dates set in advance, so the unit does not fail on the day you need it most. What goes into it depends on the units you have and the hours they run, and it is agreed in the quote or over the phone.